Hi Tawi
I had my main bathroom refitted 3 years ago at a cost of about £3,500. It took about 5 days to rip out the old one and and instal the new. It included fitting a P shaped bath with glass door and ceramic wall tiles, electric shower, large towel radiator, sink with vanity unit, low level WC, 5 downlighters and a lovely cappuccino marble tiled floor which still looks great after 3 years. The bathroom furniture was a bargain and sourced from a local plumbers merchant. Tiles from Topps Tiles
My cloakroom was finished last Saturday and took just over two days to complete. It comprises of a towel radiator, wall mounted vanity unit with rectangular ceramic sink, low level wc, polished granite floor tiles and glass mosaic tiles on one feature wall ....... it looks stunning! The bathroom furniture was purchased in The Bathstores sale last month and the tiles came from Topps Tiles. Total cost including labour £1300.
Finally, my ensuite shower room is being replaced over this Easter and is expected to take 4 days to complete. I shopped around for this - wall mounted unit with granite worktop, low level wc both from Homebase, round sink bowl, tall mixer tap, illuminated mirror and towel radiator all from Bathstore, shower tray and door from B&Q, tiles from Topps Tiles, also 3 downligters ........ total cost including labour approx £2300.
SouthEast Boy - great job with your bathroom, you must be feeling very pleased and satisfied with your very own efforts![]()