Results 1 to 2 of 2

Thread: Dreamliner set for return to service

  1. #1
    Moderator
    Join Date
    Aug 2010
    Location
    Marikina City
    Posts
    26,785
    Rep Power
    150

    Lightbulb Dreamliner set for return to service



    An Ethiopian Airlines 787 Dreamliner is due to take off from Addis Ababa on Saturday morning, the first commercial flight by the Boeing aircraft since all 787s were grounded in January.

    The 50 planes around the world were grounded due to battery malfunctions that saw one 787 catch fire in the US.

    Over the past week teams of Boeing engineers have been fitting new batteries to the aircraft.

    This was after aviation authorities approved the revamped battery design.

    The Ethiopian Airlines flight is travelling to Nairobi in Kenya.

    Engineering team

    Each 787 has two of the lithium-ion batteries in question.

    In addition to new versions of the batteries which run at a much cooler temperature, the batteries are now enclosed in stainless steel boxes.

    These boxes have a ventilation pipe that directly goes to the outside of the plane. Boeing says this means than in the unlikely event of any future fire or smoke, it would not affect the rest of the aircraft.

    Boeing said it put 200,000 engineer hours into fixing the problem, with staff working round the clock.

    A total of 300 Boeing engineers, pooled into 10 teams, have in the past week been fitting the new batteries and their containment systems around the world.

    In addition to the 50 Dreamliners in service with airlines, Boeing has upgraded the 787s it has continued to make at its factory in Seattle since January.

    The Dreamliner entered service in 2011. Half of the plane is made from lightweight composite materials, making it more fuel efficient than other planes of the same size.

    The two lithium-ion batteries are not used when the 787 is in flight.

    Instead they are operational when the plane is on the ground and its engines are not turned on, and are used to power the aircraft's brakes and lights.

    Source:-
    http://www.bbc.co.uk/news/business-22315317


  2. #2
    Administrator KeithD's Avatar
    Join Date
    Dec 2004
    Location
    Denbigh, United Kingdom
    Posts
    24,054
    Rep Power
    150
    It still hasn't been tested inflight though for longer than a few hours, and it took months for the problem to appear. No wonder then that Japan Airlines are doing 200 tests flights before allowing passengers on the jet.
    Keith - Administrator


Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Reb at your service
    By Rebearth1979 in forum Introduce Yourself
    Replies: 2
    Last Post: 23rd July 2014, 05:30
  2. Dreamliner - 2nd Country Outside of Japan...
    By lastlid in forum Flights
    Replies: 0
    Last Post: 18th August 2012, 18:19
  3. My new service
    By grahamw48 in forum Humour
    Replies: 4
    Last Post: 1st August 2012, 11:54
  4. Replies: 4
    Last Post: 24th April 2012, 16:59

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Filipino Forum : Philippine Forum