I've decided to rearrange our ensuite shower room and CR.
Following my new design layout means moving the CR from it's current position to a new position on the opposite wall about 3 metres away.
It's probably going to be a long job as the floors here are all solid concrete. Means a lot of chipping away for pipework I guess. I could possible raise the level of the floor a couple of inches but no more than that.
Anyone here ever done that ?
I'm looking for advice/help on the practicalities.
Time to get the job done doesn't matter but I want to understand any pitfalls before knocking out the old units and getting pipework ready for a new one.